LC光纤终端盒24/12口机架式12/48/24芯抽拉式光缆熔接盒1u空架

供应商
慈溪市慈普通信设备有限公司
认证
报价
85.00元每个
联系电话
15888593089
手机号
15158397282
销售经理
姜泽
所在地
慈溪市掌起镇巴里
更新时间
2022-02-13 17:19

详细介绍

3upull-out fiber distribution frame sc 96 fiberjunction box manual

 

i、application

3upull-out fiber distribution frame sc 96fiber junction boxmanual

the product can beused on the terminal of the optical cables, different types andstructures, the diameter of which are within18mm(f) tray.

      

ii、structuralfeatures.

l all propertyindexes are in accordance with national yd/t925—1997 standard.

l the body make useof cold rolling steel sheet strongadhesive force, artistic and durable.

l distinctive designof 1-2 cable entrance and fiber exit of 1-96 coresassures flexibility.

cableentrance are sealed with oil resistance nbr to increase theflexibility. users can choose to prick the entrance andexit.

l overlappingfiber-melting tray and separate insulation earth unit make thedisposition of the cores, expanding the capacity and cable-earthenflexible, convenient and safe.

iii、maintechnical specifications

l external size:(length×width×height) 430x350x3u

l weight:6.5kg

l optical fiberwinding radius: ≥40mm

l extra loss offiber tray:none

l fiber length leftin tray:≥1.6m

l fibercapacity: 48cores

l workingtemperature: - 400c ~ + 600c

l lateralpressure-resistance: 500n

l shock-resistance:750n

iv、operations

l peel the cable ,take off the outer and inner housing, as well as loose contracttube, and wash off the filling grease, leaving 1.1~1.6m  fiber and20~40mm steel core.

l fix thecable-pressing card and the cable, as well as the cable reinforcesteel core.

l lead the fiberinto the melting and connecting tray, fix heat contract tube andmelted tube to one of the connecting fiber. after melting andconnecting the fiber, move heat contract tube and melted tube andfix the stainless (or quartz) reinforce core stick ,make sure theconnecting point is in the middle of the housing pipe. heat thepipe to make the two into one.put the protected joint into thefiber-laying tray.(one tray can lay 12 cores)

l lay the left fiberin the melting and connecting tray evenly, and fix the windingfiber with nylon ties. use the trays from the bottom up. after allthe fiber has been connected, cover the top layer and fixit.

l position it anduse the earth wire in accordance with the project plan.

v、packinglist

l terminal case mainbody: 1 piece

l polishing sandcloth: 1 pcs

l melting andconnecting mark: 1 pcs

l heat shrinkablesleeve: 2~96 pcs

l tie: 4~96 pcs


外贸款光纤抽拉式

展开全文

我们其他产品
我们的新闻
咨询 在线询价 拨打电话